SOIC-14
SN74CBTLV3125DR
The SN74CBTLV3125 quadruple FET bus switch features independent line switches. Each switch is disabled when the associated output-enable (OE\) input is high. This device is fully specified for partial-power-down applications using I; The I; feature ensures that damaging current will not backflow through the device when it is powered down. The device has isolation during power off. To ensure the high-impedance state during power up or power down, OE\ should be tied to V; through a pullup resistor; the minimum value of the resistor is determined by the current-sinking capability of the driver.
Brand
TI
Package
SOIC-14
Lead Time
In stock
Date Code
22+
SN74CBTLV3125DR Parameters
| Package | SOIC-14 |
|---|---|
| Brand | TI |
| Date Code | 22+ |
| Supply polarity | Single supply |
| Operating Temperature | -40℃~85℃ |
| Quiescent current (Iq) | 10uA |
| Category | SignalSwitches/Codecs/Multiplexers |
|---|---|
| Stock | 1,417 |
| MOQ / SPQ | 1 / 1 |
| Operating voltage | 2.3V~3.6V |
| Propagation delay (tpd) | 0.25ns@3.3V, 50pF |
| Features | Specifications are available on request. |
SN74CBTLV3125DR Overview
The SN74CBTLV3125 quadruple FET bus switch features independent line switches. Each switch is disabled when the associated output-enable (OE\) input is high. This device is fully specified for partial-power-down applications using I; The I; feature ensures that damaging current will not backflow through the device when it is powered down. The device has isolation during power off. To ensure the high-impedance state during power up or power down, OE\ should be tied to V; through a pullup resistor; the minimum value of the resistor is determined by the current-sinking capability of the driver.
SN74CBTLV3125DR Procurement Checklist
For a SN74CBTLV3125DR quotation, provide the full manufacturer part number, required quantity, acceptable date code and delivery destination. Confirm the package (SOIC-14) and electrical requirements against the manufacturer documentation before ordering. Listed stock, prices and lead time require final confirmation.
