TPS61240DRVR is a TI fixed-5V synchronous boost converter to consider for a low-voltage battery-powered 5V rail. The key buying mistake is treating switch current limit as available load current. Do not approve a 5V/500mA requirement simply because a description mentions 500mA.
This guide covers the complete orderable code TPS61240DRVR. Use the TPS61240DRVR product and RFQ page; quantity, price, lot and delivery terms require quotation confirmation.
1. Parameters to verify first
Item | Verified detail | Selection implication |
|---|---|---|
Input | 2.3–5.5V | Check voltage at the IC, including battery-path drop |
Output | Fixed 5.0V; 4.9–5.1V under specified conditions | Not an arbitrary adjustable-output device |
Output capability | Up to 450mA, condition dependent | Not 450mA guaranteed over the entire input range |
Switch valley limit | TPS61240: 500mA minimum, 600mA typical at specified test conditions | Not rated load output current |
Frequency | 3.5MHz typical | Not a constant frequency promise at every light-load state |
DRV package | 6-pin WSON, nominal 2×2mm | Verify land pattern and exposed pad; not DSBGA |
Source: pages 3–5 of TI TPS6124x datasheet SLVS806D, Rev.D, December 2015. Read voltage accuracy and current together with their test conditions.
2. Why do 200mA, 450mA and 500mA all appear?
They describe different things. The feature summary states up to 450mA output. The electrical table lists 200mA output over 2.3–5.5V input; its 4.9–5.1V fixed-output specification uses a 0–200mA load range. The 500mA figure belongs to switch valley current limit.
Valley, average, peak and load currents are not interchangeable. A boost supply draws more current at its lower-voltage input, with losses added. Therefore “500mA current limit” must not become “5V/500mA output.” For loads above 200mA, evaluate the particular input voltage, temperature, external components, datasheet curves and hardware measurements rather than a headline maximum.
A product table showing 200mA and an overview saying up to 450mA are not necessarily contradictory. Write your own input and output conditions into the engineering specification and RFQ. If a supplier only answers “supports 450mA,” ask what minimum input voltage and validation support that answer.
3. Estimate battery current before choosing
Consider a 5V, 200mA load: output power is 1W. Assume 90% efficiency solely for an illustration. Using Iin≈Vout×Iout/(Vin×efficiency), average input current is about 309mA at 3.6V and 483mA at 2.3V. The assumed efficiency is not a guarantee, and these figures are calculations rather than measurements.
This shows why battery discharge increases input-path stress. It does not allow a pass/fail decision by comparing 483mA directly with a 500mA valley limit: average input current is not inductor valley current, and ripple, tolerance and transients matter. Acceptance testing should cover minimum battery voltage, cable and protection-path losses, startup and burst load operation.
Ask a measurable engineering question: “At the actual battery cutoff and worst-case temperature, how far does the 5V rail dip when the load steps to its required peak, and is that within the downstream tolerance?” This is more useful than asking for one universal current number.
4. Check DRV, R and alternative ordering codes
The TI exact ordering page identifies DRV as 6-pin WSON, TPS61240DRVR as 3,000-piece large tape-and-reel, and TPS61240DRVT as 250-piece small tape-and-reel. Factory packing quantities neither require every purchase to be a full reel nor prove that a supplier holds an original reel.
For cut tape or re-reeling, agree on quantity, leader requirements, labels and lot traceability before ordering. Confirm compatibility with the assembly line before delivery. Do not automatically approve another package or TPS61241 because the family name looks similar; route any change through engineering approval.
5. When is it worth evaluating?
A low-voltage battery design needing a fixed 5V rail, compact size and a defined load is a reasonable candidate for evaluation. Adjustable output, sustained 5V/500mA, or an unspecified minimum input voltage should trigger a requirement review first. An input range extending around 5V does not make this a general-purpose buck-boost device; check behavior separately if your supply crosses the target output voltage.
Even when the headline electrical requirements fit, examine inductor saturation, effective ceramic capacitance and PCB current loops. Build from the manufacturer reference design and package drawing, then qualify with the real load. Matching nominal inductance or capacitance alone is not sufficient approval for a component change.
6. Copy this RFQ template
Part: TPS61240DRVR; quantity: ___; input range at IC: ___; output: 5V, continuous ___mA / peak ___mA for ___; package: DRV WSON-6; packing: full reel / cut tape / re-reel ___; acceptable date codes and lots: ___; destination and required arrival: ___; labels and supply documents: ___; substitutions or packing changes: written approval required.
Start with the TPS61240DRVR product page or send these requirements through WOMAIELEC contact. Providing the input range and load profile together reduces avoidable clarification. This guide makes no stock, price, lead-time or authenticity guarantee.
Frequently asked questions
Can it directly provide 3.3V? This model is fixed at 5V; select a suitable 3.3V solution instead.
Is 450mA guaranteed? Do not interpret an up-to capability as a full-range guarantee. Validate the actual conditions.
Does 500mA mean a 5V/500mA load is supported? No. That figure describes switch valley current limit, not rated output current.
Reviewed November 15, 2026 against the TI datasheet and exact ordering page linked above. Use the applicable manufacturer revision and verified design results for final approval.
